Afterwards i took the wing inside and worked on putting in the aileron and flap servos, and running some preliminary wires for the servo extension harnesses. I glued some temporary aileron control horns, which will be removed and re-attached later once the test flights are completed, and the plane is covered.
Lastly I finished up the elevators with some depron covering, and sandwiched 2 carbon fiber rods between the layers of foam to keep the elevators from bowing.
I will start the next step with trimming the foam on the wings, and adding as I go. what I have left in the near future is:
Landing gear and linkages
elevator linkage (might change to a braided wire, not sure)
nose hinging and lock
servo access panels on tail, wings, and nose.
mounting the 6 EDF fan units and shaping/mounting of the jet nacelles.
That should be it for now, I will see you all on Tuesday!!! (Monday if i am lucky)